LCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Agilent GPC 220 Gel Permeation Chromatograph - Site Preparation Checklist

Manuals | 2012 | Agilent TechnologiesInstrumentation
GPC/SEC
Industries
Manufacturer
Agilent Technologies

Summary

Significance of the Topic


Gel permeation chromatography (GPC) is an essential technique in polymer characterization, enabling precise determination of molecular weight distributions. Proper site preparation is critical to ensure reliable instrument performance, accurate data generation, and long-term operational stability.

Objectives and Overview of the Guide


This document serves as a comprehensive pre-installation checklist for the Agilent GPC 220 system. It outlines user responsibilities and facility requirements to streamline commissioning. Key objectives include:
  • Ensuring adequate laboratory space and bench load capacity
  • Verifying environmental controls and exhaust ventilation
  • Confirming power and utility specifications
  • Preparing required consumables and operating supplies

Methodology and Instrumentation Used


The guide is structured around Agilent’s field-validated site preparation practices. It draws on input from service engineers to minimize installation issues. Primary instrumentation covered:
  • Agilent GPC 220 Gel Permeation Chromatograph with oven and solvent modules
  • Optional detector control modules such as Precision PD2040 or PL-BV 400HT

Main Findings and Discussion


Installation readiness is divided into the following critical areas:
  • Space and Weight Requirements
    The GPC 220 system measures approximately 63 cm (width) × 56 cm (height) × 140 cm (depth) and weighs about 180 kg. Laboratory benches must support this mass and allow 97 cm of vertical clearance for module lids.
  • Environmental Conditions
    Recommended ambient temperature is 15–35 °C with humidity under 80% at 25–35 °C. The area should have at least 15 air changes per hour. Exhaust from the rear fan ports (4″ diameter hoses) must be routed to a fume extraction system or safe discharge.
  • Power Requirements
    A dedicated 230 V ±10% AC, 50/60 Hz supply with two separate outlets is required for the oven and solvent modules. Install a residual current circuit breaker and use NEMA L6-15R locking receptacles where specified.
  • Operating Supplies
    Essential consumables include HPLC-grade tetrahydrofuran (2.5 L) and isopropanol (10 mL) for system checkout. Order specific vendor part numbers in advance to avoid installation delays.
  • Additional Considerations
    Instruments are delivered on pallets; user staff must pre-position modules before service arrival. Surge protection modules in both the control drawer and solvent module must be disconnected for portable appliance testing according to the provided procedure.

Benefits and Practical Applications


Following this checklist ensures smooth installation, reduces downtime, and protects equipment integrity. Well-prepared laboratories achieve consistent chromatographic performance and high-quality polymer analysis results in QA/QC, R&D, and manufacturing environments.

Future Trends and Potential Applications


Future developments in GPC technology will emphasize increased automation, seamless integration with laboratory information management systems, and advanced data analytics. Sustainable solvent approaches and microflow formats are anticipated to drive further innovations in polymer characterization.

Conclusion


A structured site preparation process is vital for successful deployment of the Agilent GPC 220 system. Addressing space, environmental, utility, and consumable requirements in advance enables reliable operation and high-quality analytical outcomes.

References


No formal references were provided in the original document.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Agilent GPC 220 HT-Instrument - Extended Site Preparation Checklist
Agilent GPC 220 HT-Instrument Extended Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
checklist, checklistsite, siteextended, extendedspecial, specialtechnologies, technologiesnotes, notespreparation, preparationdescription, descriptionrevision, revisionagilent, agilentrecommended, recommendedcustomer, customeroperating, operatingapprover, approvertcb
Agilent GPC 220 HT-Instrument - Extended Site Preparation Checklist
Agilent GPC 220 HT-Instrument Extended Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
checklist, checklistsite, siteextended, extendedspecial, specialtechnologies, technologiesnotes, notespreparation, preparationdescription, descriptionagilent, agilentrecommended, recommendedcustomer, customeroperating, operatingtcb, tcbinstrument, instrumentpower
Agilent GPC50/50 Plus Gel Permeation Chromatograph Software Revision# – Site Preparation Checklist
GPC50/50 Plus Gel Permeation Chromatograph Software Revision# – Site Preparation Checklist Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation of your Agilent software, please refer to…
Key words
checklist, checklistsite, siterevision, revisiondevices, deviceswindows, windowspreparation, preparationsoftware, softwaretechnologies, technologiesapprover, approveragilent, agilentapplicable, applicableusb, usbyour, yourvirtual, virtualmicrosoft
Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, sitetechnologies, technologiesrough, roughley, leyagilent, agilentpreparation, preparationrobert, robertsource, sourceengineering, engineeringspecial, specialcondensing, condensingpumps, pumpspump, pumpsupport
Other projects
GCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike