Agilent Cary UV Workstation 1.4 Software - Site Preparation Checklist
Manuals | 2023 | Agilent TechnologiesInstrumentation
Proper site preparation is essential for reliable operation of laboratory instrumentation over its service life. A systematic checklist minimizes installation delays, ensures compliance with hardware, software, and network prerequisites, and accelerates user adoption of the Agilent Cary UV Workstation 1.4.
This document provides a comprehensive site preparation checklist for Agilent Cary UV Workstation 1.4 software installation. It outlines customer responsibilities, environment requirements, and key setup steps to facilitate a smooth deployment and commissioning of the Cary 3500 UV-Vis spectrophotometer system.
The Cary UV Workstation 1.4 uses the Cary 3500 UV-Vis spectrophotometer connected via LAN or direct Ethernet to a Windows PC. The checklist addresses:
Key specifications for successful installation include:
Discussion emphasizes disabling power-saving features, ensuring administrator privileges, and confirming no conflicting instrument software is present.
Adhering to the site preparation checklist enables laboratories to:
Applications span research, quality assurance, and routine analysis in pharmaceutical, biotech, and materials science laboratories.
Emerging developments may include cloud-based instrument management, automated site readiness diagnostics, enhanced remote support tools, and broader integration with laboratory informatics platforms.
A thorough site preparation process as outlined in this checklist is critical for the efficient deployment of Agilent Cary UV Workstation 1.4. Following these guidelines will minimize installation issues, expedite operational readiness, and support long-term system reliability.
Agilent Technologies. Agilent Cary UV Workstation 1.4 Software Site Preparation Checklist. Rev. A.00, Document Number D0031008, July 2023.
Software, UV–VIS spectrophotometry
IndustriesManufacturerAgilent Technologies
Summary
Importance of the Topic
Proper site preparation is essential for reliable operation of laboratory instrumentation over its service life. A systematic checklist minimizes installation delays, ensures compliance with hardware, software, and network prerequisites, and accelerates user adoption of the Agilent Cary UV Workstation 1.4.
Objectives and Overview of the Document
This document provides a comprehensive site preparation checklist for Agilent Cary UV Workstation 1.4 software installation. It outlines customer responsibilities, environment requirements, and key setup steps to facilitate a smooth deployment and commissioning of the Cary 3500 UV-Vis spectrophotometer system.
Methodology and Instrumentation
The Cary UV Workstation 1.4 uses the Cary 3500 UV-Vis spectrophotometer connected via LAN or direct Ethernet to a Windows PC. The checklist addresses:
- Computing environment: operating system, .NET Framework, language settings
- Hardware configuration: CPU, memory, storage, display, pointing device, USB ports
- Network setup: TCP/IP, DHCP, same subnet connectivity, optional second NIC or isolated switch
- Firewall and antivirus considerations: required port openings and recommendations to disable or remove non-validated security software
- Software prerequisites: upgrade paths from earlier versions, compatibility notes, and backup strategy
Main Requirements and Discussion
Key specifications for successful installation include:
- Operating system: Windows 10 (20H2+) or Windows 11 (21H2+) 64-bit with .NET 3.5.1 and 4.8 Advanced Services
- Hardware: Intel i5 (3.0 GHz) or greater, 16 GB RAM, 500 GB SSD, 1920×1080 display, USB 2.0
- Network: Integrated Gigabit Ethernet, DHCP-enabled or static IP on same subnet, optional second NIC for lab intranet
- Firewall ports: a defined set of TCP/UDP ports (e.g. 3424, 53, 67-68, 80, 443, 6570-6577, 27000-27009, 52088, 6328, 8765) must be opened
- Compatibility: direct upgrades supported from versions 1.2 and 1.3 only; early versions require multi-step upgrades
Discussion emphasizes disabling power-saving features, ensuring administrator privileges, and confirming no conflicting instrument software is present.
Benefits and Practical Applications
Adhering to the site preparation checklist enables laboratories to:
- Reduce installation time and service rescheduling
- Ensure reliable instrument-to-PC communication
- Maintain data integrity through backup strategies
- Streamline user training and qualification processes
Applications span research, quality assurance, and routine analysis in pharmaceutical, biotech, and materials science laboratories.
Future Trends and Applications
Emerging developments may include cloud-based instrument management, automated site readiness diagnostics, enhanced remote support tools, and broader integration with laboratory informatics platforms.
Conclusion
A thorough site preparation process as outlined in this checklist is critical for the efficient deployment of Agilent Cary UV Workstation 1.4. Following these guidelines will minimize installation issues, expedite operational readiness, and support long-term system reliability.
References
Agilent Technologies. Agilent Cary UV Workstation 1.4 Software Site Preparation Checklist. Rev. A.00, Document Number D0031008, July 2023.
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Agilent Cary UV Networked Workstation 1.4 - Software Site Preparation Checklist
2023|Agilent Technologies|Manuals
Agilent CrossLab Start Up Services Agilent Cary UV Networked Workstation 1.4 Software Site Preparation Checklist Thank you for purchasing software from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the…
Key words
tcp, tcpnetworked, networkedcary, caryworkstation, workstationservice, serviceudp, udpopenlab, openlabserver, serverfirewall, firewallinstallation, installationolss, olssapi, apiport, portsupported, supporteddomain
Agilent Cary UV Workstation Plus 1.4 - Software Site Preparation Checklist
2023|Agilent Technologies|Manuals
Agilent CrossLab Start Up Services Agilent Cary UV Workstation Plus 1.4 Software Site Preparation Checklist Thank you for purchasing software from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the…
Key words
tcp, tcpcary, caryrevoke, revokeprivilege, privilegefirewall, firewallworkstation, workstationserver, serverservice, serviceshared, sharedapi, apiopenlab, openlabinstallation, installationpanel, panelservices, serviceshttp
Agilent Cary UV Workstation 1.5 Software Site Preparation Checklist
2024|Agilent Technologies|Manuals
Agilent CrossLab Start Up Services Agilent Cary UV Workstation 1.5 Software Site Preparation Checklist Thank you for purchasing software from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full…
Key words
tcp, tcpfirewall, firewallworkstation, workstationcary, caryapi, apiopenlab, openlabmicrosoft, microsofthttp, httpservice, servicenetwork, networkserver, serverrequirements, requirementssite, sitelicensing, licensingrest
Agilent Cary UV Workstation Plus 1.5 Software Site Preparation Checklist
2024|Agilent Technologies|Manuals
Agilent CrossLab Start Up Services Agilent Cary UV Workstation Plus 1.5 Software Site Preparation Checklist Thank you for purchasing software from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the…
Key words
tcp, tcpcary, caryrevoke, revokeprivilege, privilegeservice, servicefirewall, firewallworkstation, workstationserver, servernetwork, networkshared, sharedopenlab, openlabapi, apipanel, panelservices, servicesmicrosoft