Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist

Manuals | 2018 | Agilent TechnologiesInstrumentation
LC/TOF, LC/HRMS, LC/MS, LC/MS/MS
Industries
Manufacturer
Agilent Technologies

Summary

Importance of the Topic


Proper site preparation is a critical first step for ensuring that high-resolution Q-TOF LC/MS systems perform reliably, safely and at peak capacity over their service life. By carefully planning bench space, utilities and environmental controls in advance, laboratories can prevent installation delays, avoid operational issues and protect their investment in advanced analytical instrumentation.

Objectives and Study Overview


This checklist-style guide defines the laboratory requirements for installing the Agilent 6500 Series Q-TOF LC/MS family. It aims to identify:
  • Bench footprint and load-bearing capacity
  • Environmental conditions (temperature, humidity, vibration)
  • Utility needs (power, gases, exhaust, remote communications)
  • Recommended module stacks and ancillary equipment

By following these specifications, end users can streamline system delivery, commissioning and familiarization activities.

Methodology and Used Instrumentation


The site preparation approach is structured around a modular checklist that addresses space allocation, environmental controls, utility hookups and operating supplies. Key instrumentation and modules covered in this guide include:
  • 6500 Series Q-TOF LC/MS Systems: G6530, G6545, G6549, G6550 iFunnel, G6560 Ion Mobility
  • Ancillary equipment: Agilent TS800 dry pump, dual iFunnel rough pumps
  • Ion sources: Dual ESI, APCI, Multimode, APPI
  • UHPLC modules: Agilent 1200/1260/1290 Infinity II and thermostatted samplers
  • Mass spec bench and optional bench extension for ion mobility systems

Main Findings and Discussion


1. Bench Space and Weight Capacity
  • Each Q-TOF module requires a minimum side clearance of 8 cm and rear clearance of ~15 cm for airflow and connections.
  • Total bench height must accommodate the tallest configuration (up to 193 cm for some models) without ceiling modifications.
  • Benches supporting combined UHPLC and Q-TOF stacks must bear loads up to 613 lbs (278 kg).

2. Environmental Conditions
  • Ambient temperature: 15 °C to 35 °C with fluctuations ≤3 °C for baseline stability.
  • Relative humidity: 20 %–85 % non-condensing.
  • Vibration-free, structurally rigid support surfaces are mandatory.
  • Heat dissipation ranges from ~4,500 to ~15,524 BTU/hr, depending on model and source configuration.

3. Exhaust Venting and Gas Supplies
  • Separate ½″ tubing for foreline pump and source exhaust; total flow up to 40 L/min for certain sources.
  • Drying gas and nebulizer: nitrogen (≥95 % purity) at 5.5–6.8 bar, flows up to 30 L/min.
  • Collision cell and drift gas: ultra-high purity N₂ or Ar at 0.7–2.0 bar for Q-TOF operation, plus an additional supply for ion mobility drift gas.

4. Power and Remote Connectivity
  • Dedicated 200–240 VAC, 15 A outlets (two per Q-TOF mainframe, additional for pumps and UHPLC modules).
  • Data acquisition PC and printer require standard outlets; total consumption up to 2,850 VA.
  • LAN connectivity and a local phone line enable remote diagnostics and technical support.

5. Recommended Module Stacking
  • Direct stacking of Infinity II UHPLC modules on the Q-TOF frame is discouraged due to vibration impact.
  • Single- or multi-stack configurations should account for maximum stack height, ventilation clearance and placement of thermostatted sampler modules.

Benefits and Practical Applications


Adhering to these site preparation guidelines ensures:
  • Smooth installation and reduced downtime.
  • Optimal instrument performance, mass accuracy and baseline stability.
  • Improved safety and compliance with laboratory codes.
  • Streamlined workflow integration with UHPLC systems and data management.

Future Trends and Opportunities


Emerging developments in laboratory preparation and instrument integration include:
  • Automated environmental monitoring and adaptive HVAC controls for self-tuning temperature and humidity.
  • Modular laboratory furniture designed for rapid reconfiguration of bench space.
  • Enhanced remote diagnostics leveraging IoT connectivity and AI-driven predictive maintenance.
  • Green laboratory initiatives focusing on energy-efficient power supplies and reduced solvent and gas consumption.

Conclusion


Comprehensive site preparation is the foundation for maximizing uptime, data quality and longevity of high-resolution Q-TOF LC/MS systems. By following the structured checklist of space, environmental, utility and safety requirements, laboratories can achieve efficient installations and reliable analytical performance.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, siterough, roughtechnologies, technologiesagilent, agilentpreparation, preparationpump, pumpsource, sourcespecial, specialcondensing, condensingpumps, pumpsnotes, notesrequirements, requirementsvariations, variationsforeline
Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, sitetechnologies, technologiesrough, roughley, leyagilent, agilentpreparation, preparationrobert, robertsource, sourceengineering, engineeringspecial, specialcondensing, condensingpumps, pumpspump, pumpsupport
Agilent 6500 Series LC/QTOF Site Preparation Checklist
Agilent 6500 Series Site Preparation Checklist Agilent CrossLab Start Up Services Agilent 6500 Series LC/QTOF Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes…
Key words
rough, roughservice, servicerequirements, requirementspump, pumpspecial, specialsite, sitecondensing, condensingsource, sourceinstrument, instrumentcustomer, customernotes, notesnitrogen, nitrogenvariations, variationspumps, pumpsforeline
Agilent 6500 Series LC/QTOF - Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent 6500 Series LC/QTOF Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full value…
Key words
rough, roughservice, servicerequirements, requirementspump, pumpspecial, specialcondensing, condensingsite, sitesource, sourcenitrogen, nitrogeninstrument, instrumentcustomer, customernotes, notesvariations, variationspumps, pumpsforeline
Other projects
GCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike