Agilent RapidFire 400 System Temperature Control Unit - Site Preparation Checklist
Manuals | 2021 | Agilent TechnologiesInstrumentation
Proper preparation of laboratory sites is crucial to ensure the reliable performance and longevity of analytical instruments such as the Agilent RapidFire 400 System with Temperature Control. Meeting spatial, environmental, and utility specifications prevents installation delays, reduces service interruptions, and safeguards operator safety.
This document aims to guide users through prerequisites for the successful installation of the Agilent G9542A RapidFire 400 System Temperature Control Unit. It outlines the responsibilities of the customer regarding laboratory space allocation, environmental conditions, utility hookups, and user training requirements.
By adhering to the specified site requirements, laboratories can achieve rapid instrument deployment, minimize downtime, and maintain optimal analytical throughput. Proper setup supports reliable high-speed sample processing workflows in drug discovery, bioanalysis, and QA/QC environments.
Adherence to detailed site preparation guidelines is vital for the successful operation of the Agilent RapidFire 400 System with Temperature Control. Careful planning of space, utilities, and environmental conditions ensures efficient installation, reliable performance, and operator safety.
No references provided.
Sample Preparation, LC/MS
IndustriesManufacturerAgilent Technologies
Summary
Importance of the Topic
Proper preparation of laboratory sites is crucial to ensure the reliable performance and longevity of analytical instruments such as the Agilent RapidFire 400 System with Temperature Control. Meeting spatial, environmental, and utility specifications prevents installation delays, reduces service interruptions, and safeguards operator safety.
Objectives and Overview of the Document
This document aims to guide users through prerequisites for the successful installation of the Agilent G9542A RapidFire 400 System Temperature Control Unit. It outlines the responsibilities of the customer regarding laboratory space allocation, environmental conditions, utility hookups, and user training requirements.
Methodology and Instrumentation Used
- Instrument: Agilent G9542A RapidFire 400 System with integrated temperature control unit.
- Optional vacuum source: Agilent standalone vacuum pump or external source capable of delivering 34 L/min at 70 kPa.
- Mass spectrometry interface: Top-view workflow layouts for connection to TQ, QTOF MS, or Ultivo systems.
Main Specifications and Requirements
- Dimensions and weight: 409 kg (900 lbs); 155 cm (W) x 84.3 cm (D) x 173.9 cm (H).
- Environmental: Operating temperature range 4 °C to 35 °C; humidity 0 %–95 % non-condensing.
- Power: 120–240 V AC, 50/60 Hz; maximum consumption 750 W; two accessible outlets required.
- Heat dissipation: Approximately 2,559 BTU/hr.
- Utilities and space: Laboratory gases, plumbing, extraction, and clear bench space without overhead obstructions.
- User presence: Essential for installation and training to cover operational and safety procedures.
Benefits and Practical Applications
By adhering to the specified site requirements, laboratories can achieve rapid instrument deployment, minimize downtime, and maintain optimal analytical throughput. Proper setup supports reliable high-speed sample processing workflows in drug discovery, bioanalysis, and QA/QC environments.
Future Trends and Potential Uses
- Integration of Internet of Things (IoT) sensors for real-time environmental monitoring.
- Automated site-readiness validation using digital twins and virtual commissioning.
- Remote diagnostics and predictive maintenance to further reduce service interventions.
Conclusion
Adherence to detailed site preparation guidelines is vital for the successful operation of the Agilent RapidFire 400 System with Temperature Control. Careful planning of space, utilities, and environmental conditions ensures efficient installation, reliable performance, and operator safety.
References
No references provided.
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Agilent RapidFire 400 System - Site Preparation Checklist
2021|Agilent Technologies|Manuals
Agilent RapidFire 400 System Site Preparation Checklist Thank you for purchasing an Agilent RapidFire 400 System. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
site, sitechecklist, checklistpreparation, preparationcustomer, customerrequirements, requirementsspecial, specialdescription, descriptionultivo, ultivotemperature, temperatureqqq, qqqcontrol, controlweight, weightinstrument, instrumentfrequency, frequencysupplies
Agilent RapidFire 360 System – Site Preparation Checklist
2016|Agilent Technologies|Manuals
RapidFire 360 System – Site Preparation Checklist Thank you for purchasing an Agilent solution. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is the…
Key words
rapidfire, rapidfirestack, stackchecklist, checklistspecial, specialsite, sitenotes, notestechnologies, technologiesagilent, agilentdescription, descriptionoutput, outputsystem, systembarbed, barbedcustomer, customerpreparation, preparationoperating
Agilent RapidFire 365 System – Site Preparation Checklist
2016|Agilent Technologies|Manuals
RapidFire 365 System – Site Preparation Checklist Thank you for purchasing an Agilent solution. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is the…
Key words
rapidfire, rapidfirechecklist, checklistspecial, specialsite, sitenotes, notestechnologies, technologiesagilent, agilentdescription, descriptioncustomer, customerelevator, elevatorpreparation, preparationoperating, operatingqqq, qqqspecifications, specificationsdvd
Agilent RapidFire 300 or 360 System – Site Preparation Checklist
2012|Agilent Technologies|Manuals
RapidFire 300 or 360 System – Site Preparation Checklist Thank you for purchasing an Agilent solution. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
rapidfire, rapidfirechecklist, checklistspecial, specialsite, sitenotes, notestechnologies, technologiesoperating, operatingdescription, descriptionagilent, agilentelevator, elevatorcustomer, customerpreparation, preparationspecifications, specificationsrecommended, recommendedweight