LCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

TurboVap (Site Requirements)

Manuals | 2017 | BiotageInstrumentation
Sample Preparation
Industries
Manufacturer
Biotage

Summary

Importance of the Topic


The correct preparation of a laboratory for the installation of sample concentration and evaporation equipment like the TurboVap is critical to ensure operator safety, compliance with environmental regulations and reliable analytical performance. Proper site setup minimizes exposure to harmful solvent vapors, prevents equipment damage and supports consistent, high-throughput sample processing.

Objectives and Overview


This document defines the physical, electrical and utility requirements needed for a seamless installation of the TurboVap system. It aims to guide laboratory managers and technical staff through the essential steps to prepare the fume hood or bench area, secure gas and power connections, and verify environmental conditions before equipment arrival.

Methodology and Instrumentation


Preparation steps are based on manufacturer specifications and best practices for solvent-handling instrumentation. Key instrumentation details include:
  • TurboVap system with integrated water bath and solvent exhaust outlet
  • 3.8 m exhaust hose, 50.8 mm inner diameter
  • Gas inlet tubing, 3 m length, 4 mm inner diameter
  • Optional pressure regulator and supply connection set (P/N 352281SP and P/N 353480SP)

Main Findings and Discussion


Site requirements are summarized as follows:
  • Ventilation: Exhaust capacity ≥ 1 m3/min (35.3 ft3/min), either via fume hood or dedicated ducting
  • Clearances: Minimum 30 mm front clearance; overall system footprint 400 × 400 × 390 mm (lid closed), height 590 mm (lid open)
  • Weight support: System weighs 17 kg empty, up to 29 kg when filled; total shipping weight 20 kg
  • Environmental conditions: Operating temperature 18–32 °C; relative humidity 20–90 % (non-condensing)
  • Electrical: Single grounded outlet, 100–127 V or 220–240 V, 50/60 Hz, 1000 VA
  • Gas supply: Inert gas recommended (nitrogen preferred); minimum pressure 4 bar (0.4 MPa), full-flow at 6 bar; maximum 9 bar; flow rates vary by manifold positions (up to 200 L/min for 48 positions at 6 bar)
  • External safety: Fire protection as per local unattended-equipment regulations

Benefits and Practical Applications


Adhering to these requirements ensures:
  • Safe removal of solvent vapors, protecting personnel and environment
  • Optimal performance and reproducibility of evaporation procedures
  • Reduced downtime during installation and commissioning
  • Simplified maintenance and compliance with laboratory safety standards

Future Trends and Opportunities


Laboratories can enhance solvent evaporation setups by integrating:
  • Automated solvent monitoring and ventilation control
  • Remote status alerts and IoT-enabled performance logging
  • Advanced inert-gas management systems for explosion-prone solvents
  • Modular footprints to fit evolving lab layouts and throughput demands

Conclusion


Proper site preparation according to the TurboVap requirements document is fundamental for a smooth installation, reliable operation and safe handling of volatile solvents. Early coordination with facility managers and adherence to these specifications will expedite commissioning and support long-term analytical productivity.

References


  • Biotage. Site Requirements TurboVap. UI345.v1, 2017.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
 Biotage® Extrahera (Site Requirements)
User Instruction UI326.v5 Site Requirements Biotage Extrahera | Page 1 ® ™ Site Requirements Biotage Extrahera ® ™ Dear Valued Customer, The following document will assist you in the preparation of your laboratory for a successful installation of Biotage Extrahera…
Key words
supply, supplyhood, hoodfume, fumeresponsibility, responsibilityventilation, ventilationrequirements, requirementsbiotage, biotagepressure, pressuresystem, systemiindia, iindiaensure, ensurecustomer, customergas, gasspecified, specifieddimensions
Site Requirements - Biotage Extrahera LV-200
Site Requirements - Biotage Extrahera LV-200
2021|Biotage|Brochures and specifications
Site Requirements Biotage Extrahera LV-200 | Page 1 ® ™ Site Requirements Biotage Extrahera LV-200 ® ™ Dear Valued Customer, The following document will assist you in the preparation of your laboratory for a successful installation of Biotage Extrahera LV-200.…
Key words
supply, supplyhood, hoodfume, fumeresponsibility, responsibilityventilation, ventilationrequirements, requirementspressure, pressuresystem, systemiindia, iindiaensure, ensurecustomer, customergas, gasspecified, specifieddimensions, dimensionsconnection
Biotage TurboVap® 96 Dual - Evaporation Reinvented
Biotage TurboVap® 96 Dual - Evaporation Reinvented
2022|Biotage|Brochures and specifications
TurboVap 96 Dual ® Evaporation Reinvented Patent pending This is Biotage This is Biotage Biotage is a Global Impact Tech Company committed to solving society’s problems. We offer workflow solutions and products to customers in drug discovery and development, analytical…
Key words
biotage, biotageevaporation, evaporationfume, fumepending, pendingpatent, patentrifi, rifiplate, platehood, hoodtio, tioventilation, ventilationheating, heatingpackage, packageexhaust, exhaustconvection, convectionplasmid
TurboVap (Installation and Safety)
TurboVap ® Installation and Safety Contents TurboVap ® Installation and Safety CONTENTS 1 2 Site Requirements Installation of TurboVap LV ® 2  Unpack the System 2  Install the System 3  Fill the Water Bath 3  Adjust the TurboVap LV Manifold 3  Turn on the System…
Key words
turbovap, turbovapsystem, systemsafety, safetybath, bathwarning, warningexhaust, exhaustventilation, ventilationinstallation, installationunpack, unpackwater, waterbiotage, biotagesupply, supplyhood, hoodfume, fumehose
Other projects
GCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike