LCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Biotage Extrahera - Installation and Familiarization Checklist

Manuals | 2017 | BiotageInstrumentation
Sample Preparation
Industries
Manufacturer
Biotage

Summary

Importance of the Topic


Proper installation and operator familiarization of analytical instruments such as the Biotage Extrahera is critical to ensure reliable sample processing and data quality. A structured checklist helps mitigate installation errors, verifies compliance with site requirements, and accelerates operator proficiency. Such standardized procedures reduce downtime, support regulatory adherence, and increase throughput in research and QA/QC laboratories.

Objectives and Overview


The installation and familiarization process aims to:
  • Confirm receipt and integrity of all shipment components
  • Validate site preparation, including power, gas, and environmental conditions
  • Complete physical setup, software configuration, and functional validation
  • Provide a concise operational overview for new system users

Methodology and Procedures


The overall workflow comprises shipping review, site preparation, hardware setup, start-up, system verification, and operator familiarization. Key steps include:
  • Inspect shipment and packaging for damage, verify all parts are present
  • Ensure nitrogen and air supplies meet pressure and quality standards
  • Verify mains voltage (120–240 VAC, 50/60 Hz) and maintain temperature (18–32 °C) and humidity (10–90 % RH)
  • Unpack and place the instrument in a ventilated enclosure or benchtop setup
  • Connect electrical, computer, gas, pneumatic, solvent, waste, and vacuum lines
  • Power on the system, update software and firmware as needed, and configure system parameters
  • Perform solvent and water prime cycles, pressure head tests, waste valve functionality checks, and pipetting performance tests
  • Record calibration data, test results, and software versions for traceability

Used Instrumentation


The primary instrument is the Biotage Extrahera automated solid-phase extraction system. Supporting devices include external vacuum or house vacuum pumps, nitrogen and air supply regulators, solvent and tip racks, and a computer loaded with the latest application and controller software.

Main Results and Discussion


The system verification confirmed all solvent pumps and lines are functional, pressure thresholds are met, and waste valve actuation is smooth. Calibration coefficients, offsets, and pipetting accuracy (%CV and %accuracy across eight channels) were within specified tolerances. These results demonstrate successful installation and readiness for analytical workflows.

Benefits and Practical Applications


  • Ensures consistency and reproducibility of extractions in research and quality control
  • Minimizes installation-related errors and instrument downtime
  • Accelerates operator competency through structured familiarization
  • Supports compliance with ISO and laboratory regulatory standards

Future Trends and Opportunities


As laboratory automation evolves, integration of remote diagnostics, cloud-based monitoring, and AI-driven maintenance scheduling will enhance uptime and data integrity. Advances in modular design and multi-sample parallel processing may further increase throughput and flexibility in diverse analytical applications.

Conclusion


A comprehensive installation and familiarization checklist is essential for optimal performance of the Biotage Extrahera system. Following structured protocols ensures system reliability, regulatory compliance, and efficient user adoption, laying the foundation for robust analytical workflows.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Biotage Extrahera LV-200 Installation and Familiarization Checklist
Biotage Extrahera LV-200 Installation and Familiarization Checklist | Page 1 ® ™ Biotage Extrahera LV-200 Installation and Familiarization Checklist ® ™ The following document will ensure that the installation is complete and that all installation steps and tasks have been…
Key words
fail, failpass, passtasks, tasksnotes, noteschecklist, checklistversion, versionreview, reviewinstallation, installationfamiliarization, familiarizationsystem, systemcustomer, customervac, vacdate, datemains, mainsventilation
Biotage TurboVap - Installation and Familiarization Checklist
TurboVap Installation and Familiarization Checklist | Page 1 ® TurboVap Installation and Familiarization Checklist ® The following document will ensure that the installation is complete and that all installation steps and tasks have been performed. It will also provide guidelines…
Key words
tasks, tasksnotes, notesverify, verifyturbovap, turbovapchecklist, checklistfamiliarization, familiarizationsystem, systeminstallation, installationcustomer, customermanifold, manifoldserial, serialdate, dateexplain, explainreview, reviewnozzles
Biotage Horizon 5000 Installation and Familiarization Checklist
Biotage Horizon 5000 Installation and Familiarization Checklist | Page 1 ® Biotage Horizon 5000 Installation and Familiarization Checklist ® The following document will ensure that the installation is complete and that all installation steps and tasks have been performed. It…
Key words
tasks, tasksnotes, notesvent, ventinstallation, installationfamiliarization, familiarizationsystem, systemair, airinspect, inspectexplain, explainthermistor, thermistorverify, verifyoperators, operatorschecklist, checklistreview, reviewsolvent
Biotage Extrahera - GLP Software Checklist
Biotage Extrahera GLP Software Checklist | Page 1 ® ™ Biotage Extrahera GLP Software Checklist ® ™ The following document will ensure that the GLP software is correctly installed and that all necessary tasks have been performed. For network configuration…
Key words
glp, glpextrahera, extraheraadministrator, administratorchecklist, checklistname, namenotes, notesengineer, engineerinstalltion, installtiontasks, tasksdate, dateinstall, installsoftware, softwareensure, ensurecustomer, customerplease
Other projects
GCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike