LCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Biotage Horizon 5000 Installation and Familiarization Checklist

Brochures and specifications | 2020 | BiotageInstrumentation
Sample Preparation
Industries
Manufacturer
Biotage

Summary

Importance of Topic


A reliable installation and initial familiarization process of automated solid-phase extraction systems like the Biotage Horizon 5000 ensures operational safety, analytical precision, and reproducible sample preparation in research and quality control environments.

Goals and Overview


The document outlines a stepwise checklist designed to confirm that all site preparations, hardware setup, software installation, and functional verifications are completed for the Biotage Horizon 5000. It also provides a concise operator introduction covering the instrument’s core functions, basic maintenance, and troubleshooting guidance.

Methodology and Instrumentation


  • Shipping verification procedures to check for damage and completeness.
  • Site readiness checks including power supply, ventilation, and optional nitrogen source.
  • Unpacking, positioning, and mechanical installation steps for the 28 kg system.
  • Assembly of solvent and waste containers, lines, and optional accessories (1-Pass kits, N2 regulator).
  • Software installation and initial configuration of USB drivers, Horizon 5000 software, and firmware version recording.
  • Functional tests including solvent configuration, thermistor response, and execution of a multi-step SPE method.
  • Operator familiarization covering hardware, software, maintenance, and troubleshooting.

Main Outcomes and Discussion


Following the checklist, technicians and operators verify correct hardware assembly, stable power and gas connections, and proper software communication. Functional testing demonstrates consistent solvent delivery, thermistor accuracy, and reproducible extraction volumes across multiple stations. The method execution confirms that elution, drying, and waste handling perform within specified parameters, ensuring system readiness.

Benefits and Practical Applications


  • Streamlined laboratory setup reduces downtime and prevents installation errors.
  • Standardized checks promote reproducible solid-phase extraction workflows.
  • Operator familiarization accelerates independence in routine analytical tasks.
  • Comprehensive test records support quality assurance and regulatory compliance.

Future Trends and Applications


As automated extraction systems evolve, integration with remote diagnostics, cloud-based data management, and AI-driven method optimization will further enhance system uptime and analytical throughput. Advances in modular accessories and real-time monitoring promise customizable workflows for emerging applications in environmental analysis, pharmaceuticals, and food safety.

Conclusion


A structured installation and familiarization procedure is critical to delivering reliable performance of the Biotage Horizon 5000. By adhering to the checklist, laboratories ensure safe operation, consistent analytical results, and rapid operator proficiency.

Instrumentation


  • Biotage Horizon 5000 automated SPE system
  • Optional nitrogen gas kit (60–80 psi)
  • 1-Pass and carbon cartridges
  • Thermistor sensors and vacuum pump
  • Horizon 5000 software and USB interface

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Biotage Extrahera - Installation and Familiarization Checklist
Biotage Extrahera Installation and Familiarization Checklist | Page 1 ® ™ Biotage Extrahera Installation and Familiarization Checklist ® ™ The following document will ensure that the installation is complete and that all installation steps and tasks have been performed. It…
Key words
tasks, tasksnotes, notesfail, failextrahera, extraherachecklist, checklistinstallation, installationpass, passreview, reviewfamiliarization, familiarizationversion, versioncustomer, customersystem, systemtest, testdate, datevac
Biotage Extrahera LV-200 Installation and Familiarization Checklist
Biotage Extrahera LV-200 Installation and Familiarization Checklist | Page 1 ® ™ Biotage Extrahera LV-200 Installation and Familiarization Checklist ® ™ The following document will ensure that the installation is complete and that all installation steps and tasks have been…
Key words
fail, failpass, passtasks, tasksnotes, notesversion, versionchecklist, checklistreview, reviewinstallation, installationfamiliarization, familiarizationsystem, systemcustomer, customerdate, datevac, vacmains, mainsventilation
Biotage TurboVap - Installation and Familiarization Checklist
TurboVap Installation and Familiarization Checklist | Page 1 ® TurboVap Installation and Familiarization Checklist ® The following document will ensure that the installation is complete and that all installation steps and tasks have been performed. It will also provide guidelines…
Key words
tasks, tasksnotes, notesverify, verifyturbovap, turbovapchecklist, checklistfamiliarization, familiarizationsystem, systeminstallation, installationcustomer, customermanifold, manifoldserial, serialdate, dateexplain, explainreview, reviewnozzles
Biotage Horizon 5000 - Users Guide
Biotage® Horizon 5000 Automated Extraction System Users Guide SMARTPREP MODULE 16 Northwestern Drive, Salem, NH 03079 Telephone: (603) 893-3663 Toll-Free: (800) 997-2997 USA Only Website: www.biotage.com Copyright © 2020 Biotage. All rights reserved. No material may be reproduced or published…
Key words
solvent, solventoff, offdisk, diskcontainer, containeroverflow, overflowdrain, draintime, timeelute, elutewiv, wivscreen, screensaturate, saturatesoak, soakmethylene, methylenesample, sampledraining
Other projects
GCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike