LCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Biotage TurboVap - Installation and Familiarization Checklist

Manuals | 2017 | BiotageInstrumentation
Sample Preparation
Industries
Manufacturer
Biotage

Summary

Importance of the Topic


The proper installation and operator familiarization of the TurboVap evaporator system are essential to guarantee reliable performance, reproducible results and safe operation in analytical laboratories. A structured installation checklist minimizes setup errors, prevents equipment damage and ensures consistent sample processing.

Study Objectives and Overview


This checklist serves as a comprehensive guide for field service engineers and end users to complete and document all installation tasks, verify site requirements, perform system validation and provide basic user training. It covers shipment inspection, site preparation, electrical and environmental checks, system assembly, software setup, functional testing and initial operator familiarization.

Methodology and Instrumentation


The installation and familiarization process is organized into sequential steps:
  • Shipping Review: Confirm receipt of all components, inspect packaging and initiate damage claims if required.
  • Site Preparations: Verify lab conditions, electrical supply (110 VAC or 230 VAC), inert gas pressure and adequate ventilation.
  • Unpacking and Setup: Position the TurboVap LV/II/EH system, configure voltage selector, connect gas and exhaust, fill water bath with deionized water plus Aqua Stabil.
  • Software Configuration: Ensure the latest firmware/software version, configure nozzles, gas flow rates and water bath parameters.
  • Functional Tests: Validate water bath heating, gas flow accuracy, light and sound controls, and perform nozzle checks.
  • Operator Familiarization: Review hardware components, manifold and end-point sensor configuration, software menus, safety warnings and routine maintenance tasks.

Main Results and Discussion


All installation tasks were successfully completed and documented. Voltage and environmental conditions met manufacturer specifications. Functional tests confirmed:
  • Accurate water bath temperature control within ±2 °C.
  • Consistent gas flow rates at setpoints of 2.0 L/min with rapid response to pause and resume commands.
  • Proper operation of manifold air shield, exhaust hose and optional end-point sensors.
  • Responsive system indicators for light, sound and error alerts.
These results demonstrate that the system is fully operational and ready for routine use.

Benefits and Practical Applications


The standardized checklist approach offers multiple advantages:
  • Reduces installation time and prevents oversights.
  • Enhances operator confidence through hands-on familiarization.
  • Supports laboratory quality assurance by documenting compliance with site and system requirements.
  • Facilitates ongoing maintenance and troubleshooting.

Future Trends and Potential Applications


Emerging developments in evaporator technology and laboratory automation may include:
  • Integration with laboratory information management systems (LIMS) for real-time tracking.
  • Remote diagnostics and software updates via cloud connectivity.
  • Advanced end-point detection sensors for improved solvent recovery and safety.
  • Energy-efficient designs and greener solvent handling workflows.

Conclusion


The TurboVap Installation and Familiarization Checklist provides a robust framework to ensure correct system setup, comprehensive functional validation and effective operator training. By following this structured procedure, laboratories can achieve reliable performance, maintain high safety standards and optimize sample throughput.

Reference


  • Biotage. TurboVap Installation and Familiarization Checklist, Part Number UI382. 2017.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Biotage Horizon 5000 Installation and Familiarization Checklist
Biotage Horizon 5000 Installation and Familiarization Checklist | Page 1 ® Biotage Horizon 5000 Installation and Familiarization Checklist ® The following document will ensure that the installation is complete and that all installation steps and tasks have been performed. It…
Key words
tasks, tasksnotes, notesvent, ventinstallation, installationfamiliarization, familiarizationsystem, systemair, airinspect, inspectexplain, explainthermistor, thermistorverify, verifyoperators, operatorschecklist, checklistreview, reviewsolvent
Biotage Extrahera - Installation and Familiarization Checklist
Biotage Extrahera Installation and Familiarization Checklist | Page 1 ® ™ Biotage Extrahera Installation and Familiarization Checklist ® ™ The following document will ensure that the installation is complete and that all installation steps and tasks have been performed. It…
Key words
tasks, tasksnotes, notesfail, failchecklist, checklistinstallation, installationextrahera, extraherapass, passreview, reviewfamiliarization, familiarizationversion, versioncustomer, customersystem, systemtest, testvac, vacdate
Biotage Extrahera LV-200 Installation and Familiarization Checklist
Biotage Extrahera LV-200 Installation and Familiarization Checklist | Page 1 ® ™ Biotage Extrahera LV-200 Installation and Familiarization Checklist ® ™ The following document will ensure that the installation is complete and that all installation steps and tasks have been…
Key words
fail, failpass, passtasks, tasksnotes, noteschecklist, checklistversion, versionreview, reviewinstallation, installationfamiliarization, familiarizationsystem, systemcustomer, customervac, vacdate, datemains, mainsventilation
TurboVap (Installation and Safety)
TurboVap ® Installation and Safety Contents TurboVap ® Installation and Safety CONTENTS 1 2 Site Requirements Installation of TurboVap LV ® 2  Unpack the System 2  Install the System 3  Fill the Water Bath 3  Adjust the TurboVap LV Manifold 3  Turn on the System…
Key words
turbovap, turbovapsystem, systemsafety, safetybath, bathwarning, warningexhaust, exhaustventilation, ventilationinstallation, installationunpack, unpackwater, waterbiotage, biotagesupply, supplyhood, hoodfume, fumehose
Other projects
GCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike