ACQUITY Premier System - Site Preparation Guide
Manuals | 2022 | WatersInstrumentation
The ACQUITY Premier System is a high-performance liquid chromatography platform designed for sensitive and reproducible analysis across diverse applications. Proper site preparation is critical to ensure safe installation, optimal instrument performance, regulatory compliance, and minimal downtime.
This guide outlines the essential steps for preparing a laboratory facility prior to installation by a Waters Field Service Engineer. It covers storage, shipment handling, bench configuration, power and environmental requirements, waste management, solvent and gas provisioning, and test sample readiness to facilitate a smooth and efficient installation.
The guide distills over 27 pages of requirements into a practical checklist of critical checkpoints. Emphasis on early planning for space, weight, power, and environmental parameters ensures installations proceed without delay. Clearly defined customer and Waters responsibilities streamline the process, support safety, and uphold GLP standards.
Emerging developments include automation of site qualification workflows, remote pre-installation diagnostics, the use of digital twins for laboratory layout planning, and mobile applications to guide customers through preparation steps.
Comprehensive site preparation is fundamental to achieving reliable and efficient ACQUITY Premier System installations. Following the detailed guidelines and verification procedures ensures seamless deployment, operational safety, and consistent analytical performance.
HPLC
IndustriesManufacturerWaters
Summary
Significance of the topic
The ACQUITY Premier System is a high-performance liquid chromatography platform designed for sensitive and reproducible analysis across diverse applications. Proper site preparation is critical to ensure safe installation, optimal instrument performance, regulatory compliance, and minimal downtime.
Objectives and overview of the guide
This guide outlines the essential steps for preparing a laboratory facility prior to installation by a Waters Field Service Engineer. It covers storage, shipment handling, bench configuration, power and environmental requirements, waste management, solvent and gas provisioning, and test sample readiness to facilitate a smooth and efficient installation.
Used instrumentation
- ACQUITY Premier Binary Solvent Manager (BSM)
- ACQUITY Premier Quaternary Solvent Manager (QSM)
- ACQUITY Premier Sample Manager – Fixed Loop (SM-FL) or Flow-through Needle (SM-FTN)
- ACQUITY Premier Column Manager – Active (CM-A) and Auxiliary (CM-Aux)
- ACQUITY Premier Column Heater – Active (CH-A) or 30 cm Column Heater/Cooler (CHC)
- Extended Wavelength Photodiode Array Detector (eλPDA) or Tunable Ultraviolet Detector (TUV)
- Fluorescence Detector (FLR), Refractive Index Detector (RI), or Single Quadrupole Detector (QDa/SQD 2)
- Optional mass spectrometer integration (e.g., Xevo TQD)
- Accessories: drip trays, flex cart, waste container
Methodology
- Relocating and storing shipping containers: adhere to lifting protocols, maintain crate integrity, confirm facility access dimensions, and store at 0–40 °C and <80% humidity.
- Bench and space requirements: configure single- to multi-stack layouts, verify bench load capacity, provide clearances (rear 6 in, sides 3 in, overhead 5 ft), and assess flex cart support.
- Workstation setup: prepare chromatography data system computers meeting Waters software and OS specifications.
- Power supply: allocate dedicated grounded receptacles for each module, observe over-voltage Category II, and avoid extension cords.
- Environmental control: maintain ambient temperature 4–40 °C (optimum 19–22 °C), relative humidity 20–80% non-condensing, minimal vibration, and low dust.
- Waste and exhaust management: install a closed drip drainage system, route solvent exhaust to ventilation, and place waste containers under the bench.
- Consumables and supplies: ensure availability of LC/MS-grade solvents, clean solvent bottles and glassware, gas supplies for MS, test samples, and laboratory essentials (gloves, vials, pipettes).
- Verification process: complete a nine-point checklist to confirm readiness in relocation, space, workstation, power, environment, solvents, gases, test samples, and customer-supplied items.
Main results and discussion
The guide distills over 27 pages of requirements into a practical checklist of critical checkpoints. Emphasis on early planning for space, weight, power, and environmental parameters ensures installations proceed without delay. Clearly defined customer and Waters responsibilities streamline the process, support safety, and uphold GLP standards.
Benefits and practical applications
- Reduced installation time and costs by preventing rescheduling due to unprepared sites.
- Enhanced safety and compliance with electrical, mechanical, and chemical handling guidelines.
- Optimized system reliability and performance through adherence to environmental specifications.
- Simplified documentation and verification via a structured pre-installation checklist.
Future trends and applications
Emerging developments include automation of site qualification workflows, remote pre-installation diagnostics, the use of digital twins for laboratory layout planning, and mobile applications to guide customers through preparation steps.
Conclusion
Comprehensive site preparation is fundamental to achieving reliable and efficient ACQUITY Premier System installations. Following the detailed guidelines and verification procedures ensures seamless deployment, operational safety, and consistent analytical performance.
References
- Controlling Contamination in LC/MS Systems (715001307)
- Preventing Contamination in ACQUITY UPLC/MS Systems (video)
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
ACQUITY UPLC/ ACQUITY Premier Systems with 2D Technology - Site Preparation Guide
2021|Waters|Manuals
715002972 VER. 01 (previously released as Rev. A) ACQUITY UPLC/ ACQUITY Premier Systems with 2D Technology Site Preparation Guide © 2021 WATERS CORPORATION. ALL RIGHTS RESERVED. 715002972 VER. 01 2 OF 32 Table of contents General information . . .…
Key words
requirements, requirementsacquity, acquitycustomer, customerspace, spaceverify, verifymet, metpremier, premierreceptacle, receptaclebsm, bsmuplc, uplcrelocating, relocatingsolvent, solventload, loadsales, salesels
Pre-installation Checklist Varian 1200/1200L Mass Spectrometer
|Agilent Technologies|Manuals
NOTICE: Varian, Inc. was acquired by Agilent Technologies in May 2010. This document is provided as a courtesy but is no longer kept current and thus will contain historical references to Varian. For more information, go to www.agilent.com/chem. Pre-installation Checklist…
Key words
installation, installationdraw, drawanhydrous, anhydrousspace, spaceammonia, ammoniagas, gasrequirements, requirementsmax, maxprinter, printercurrent, currentallow, allowlifting, liftingappropriate, appropriatecid, cidcaution
Agilent G5573A Bravo NGS Option A - Site Preparation Checklist
2023|Agilent Technologies|Manuals
Agilent CrossLab Start Up Services Agilent G5573A Bravo NGS Option A Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the…
Key words
bravo, bravongs, ngsdeck, deckspecial, specialservice, serviceweight, weightcustomer, customerrequirements, requirementsthermocube, thermocubesite, sitemtc, mtcoption, optioninheco, inhecodescription, descriptionapprox
Agilent Revident LC/QTOF Site Preparation Checklist
2023|Agilent Technologies|Manuals
Agilent CrossLab Start Up Services Agilent Revident LC/QTOF Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full value of…
Key words
revident, revidentsite, sitetof, tofchecklist, checklistagilent, agilentcontino, continopreparation, preparationseries, seriesnathan, nathanservice, servicespecial, specialforeline, forelineqtof, qtofrequirements, requirementsrevision