LCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Agilent G5573A Bravo NGS Option A - Site Preparation Checklist

Manuals | 2023 | Agilent TechnologiesInstrumentation
Sample Preparation
Industries
Manufacturer
Agilent Technologies

Summary

Importance of the Topic



Proper site preparation for high-throughput liquid-handling systems is critical to achieving reliable performance, extending instrument lifespan, and accelerating data generation in next-generation sequencing workflows. By defining space, utility, environmental, and safety requirements up front, laboratories can avoid installation delays, reduce troubleshooting, and maximize return on investment.

Objectives and Overview of the Document



This checklist aims to guide users through all customer responsibilities and facility conditions required for the Agilent G5573A Bravo NGS Option A installation. It covers:
  • Laboratory bench space and weight support
  • Environmental controls and vibration considerations
  • Power and utility needs
  • Necessary operating supplies
  • Safety and compliance measures

Methodology and Used Instrumentation



The document compiles site-readiness criteria based on the hardware and software components of the Bravo NGS Option A. Instrumentation details include:
  • Bravo Automated Liquid-Handling Platform with 96-LT pipetting head
  • Light Curtain, safety shields, and emergency-stop pendant
  • Inheco MTC Controller for Peltier Thermal Stations
  • ThermoCube recirculating chiller
  • Deck accessories: dual Peltier modules, orbital shaker, magnetic bead accessory, cooling pad
  • Dedicated computer workstation with VWorks Automation Control software

Main Results and Discussion



Key site requirements identified:
  • Bench dimensions: platform footprint 64.8×43.8×84.3 cm, weight ~52 kg; additional controllers and computer total ~95 kg
  • Table specifications: chemical-resistant surface, level frame with cross members, caster locks, minimum height 86 cm
  • Environmental envelope: ambient 4 °C to 40 °C, 10–90% non-condensing humidity, low vibration
  • Electrical supply: single-phase 100–240 VAC, 50/60 Hz, 10 A, plus 10 additional outlets for accessories
  • Operating supplies: glycol-based coolant, filtered pipette tips, microplates, reservoirs
  • Computer requirements: Windows 10 64-bit, 3.2 GHz quad-core, 8 GB RAM, 500 GB storage, Ethernet ports, USB/serial ports

Adhering to these parameters minimizes installation delays, ensures safety interlocks function correctly, and prevents instrument errors caused by power or environmental deviations.

Benefits and Practical Applications



Well-prepared labs benefit from:
  • Faster instrument commissioning and qualification
  • Reduced downtime due to environmental or power inconsistencies
  • Enhanced operator training efficiency by having all supplies and utilities ready
  • Compliance with safety standards to protect personnel

Future Trends and Opportunities



Emerging directions in liquid-handling site preparation include:
  • Integration of IoT-enabled sensors for real-time monitoring of temperature, humidity, and vibration
  • Digital twin simulations to optimize lab layout before physical installation
  • Automated utility verification tools to validate electrical and network configurations
  • Eco-friendly consumables and coolant formulations to reduce environmental impact

Conclusion



Comprehensive site preparation is the cornerstone of a smooth installation and reliable operation of the Bravo NGS Option A. By following the detailed checklist for space, utilities, environment, supplies, and safety, laboratories can expedite startup, maintain instrument performance, and support high-throughput sequencing workflows with confidence.

Reference



No references provided.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Agilent G5523A/G Bravo Platform – Site Preparation Checklist
Agilent G5523A/G Bravo Platform – Site Preparation Checklist Thank you for purchasing an Agilent G5523A/G Bravo Automated Liquid Handling Platform. To get you started and to assure a successful and timely installation, please refer to this specification or set of…
Key words
approx, approxchecklist, checklistsite, sitecustomer, customersafety, safetyspecial, specialtechnologies, technologieslbs, lbsagilent, agilentvaries, variesnotes, notespreparation, preparationinstallation, installationequipment, equipmentcondensing
Agilent G6475A and 6495D LC/TQ Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent G6475A and 6495D LC/TQ Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full…
Key words
special, specialnitrogen, nitrogenground, groundrequirements, requirementshydrocarbon, hydrocarbonline, lineservice, servicesource, sourcecustomer, customernotes, notessite, sitefree, freeinstrument, instrumentengineer, engineerexhaust
Agilent 7100 Capillary Electrophoresis - Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent 7100 Capillary Electrophoresis Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full value…
Key words
special, specialsite, sitecustomer, customernotes, notesweight, weightrequirements, requirementsinstrument, instrumentservice, servicebench, benchyour, youroperating, operatingpreparation, preparationconsumption, consumptiondimensions, dimensionsengineer
Agilent Cary 3500 UV-Vis - System Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent Cary 3500 UV-Vis System Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full…
Key words
description, descriptionpower, powercord, cordspecial, specialoperating, operatingrequirements, requirementsinstrument, instrumentweight, weightvis, visservice, servicecustomer, customersite, sitelbs, lbspeltier, peltierpart
Other projects
GCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike