LCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Cary 7000 Universal Measurement System (UMS) – Site Preparation Checklist

Manuals | 2016 | Agilent TechnologiesInstrumentation
NIR Spectroscopy, UV–VIS spectrophotometry
Industries
Manufacturer
Agilent Technologies

Summary

Significance of the topic


Proper site preparation for high-end UV-Vis/NIR spectrophotometers like the Cary 7000 UMS is essential to guarantee accurate measurements, extended instrument lifetime, and minimal downtime. By addressing spatial, environmental, power, and safety requirements in advance, laboratories can avoid installation delays, reduce maintenance interventions, and ensure consistent analytical performance.

Objectives and study overview


This document serves as a comprehensive checklist outlining the customer’s responsibilities and the technical specifications necessary for a successful installation of the Cary 7000 UMS. It aims to guide laboratory managers and technicians through space allocation, utility provisioning, and supply acquisition to streamline system setup and commissioning.

Methodology and instrumentation


The checklist compiles requirements in the following categories:
  • Laboratory bench dimensions and load capacity
  • Environmental control parameters (temperature, humidity, contamination)
  • Electrical supply specifications (voltage, grounding, dedicated outlets)
  • Optional consumables and operational accessories
  • Additional gas purging arrangements
  • Safety and ergonomic handling procedures

Instrumentation used:
  • Agilent Cary 7000 Universal Measurement System (UMS)

Main results and discussion


Key findings from the site preparation checklist include:
  • Spatial footprint: Packed and unpacked dimensions provided to ensure adequate bench height (≈90 cm) and clearance around the instrument for ventilation and service access.
  • Load requirements: Maximum mass per component (e.g., 91 kg for the unpacked main unit) to verify bench strength and vibration isolation.
  • Environmental limits: Recommended ambient temperature (20–25 °C), humidity (<90 %), and contaminant-free air to maintain optical alignment and detector stability.
  • Power demands: Single-phase AC supply (100–240 VAC, 50–60 Hz), dedicated outlet with earth grounding, and maximum consumption of 185 W.
  • Nitrogen purge system: Optional connection details for dry, oil-free N2 at 12–25 psi, using appropriate regulators, tubing, and flow meters to prevent optical contamination.
  • Safety notes: Guidelines for handling heavy components, using corrosion-resistant bench surfaces, and observing laboratory chemical safety practices.

Benefits and practical applications of the method


Following this structured site preparation checklist enables laboratories to:
  • Achieve first-time installation success with minimal on-site adjustments.
  • Protect sensitive optical components from environmental damage.
  • Ensure regulatory compliance and safety during instrument operation.
  • Optimize performance reproducibility in QA/QC, research, and industrial settings.

Future trends and possibilities


Emerging developments that may impact site preparation and system integration include:
  • Remote environmental monitoring and automated alerts for temperature, humidity, and vibration.
  • Modular instrument platforms enabling flexible bench layouts and rapid reconfiguration.
  • Integration with laboratory information management systems (LIMS) for automated qualification and preventive maintenance scheduling.
  • Digital twin technology to simulate installation scenarios and optimize site layouts virtually before equipment delivery.

Conclusion


Thorough preinstallation planning using the Agilent Cary 7000 UMS site preparation checklist is vital for unlocking the system’s full performance potential. By systematically addressing space, environmental, power, and safety requirements, laboratories can secure a reliable, high-precision analytical platform that meets demanding research and quality assurance workflows.

Reference


  • Agilent Technologies. Cary 7000 Universal Measurement System – Site Preparation Checklist. Issued 21-November-2016, Revision 3.0.
  • Agilent Technologies. Cary 100/300/4000/5000/6000i/7000 User’s Guide, Publication Number 8510197200.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Cary 4000/5000/6000i UV-Vis spectrophotometer – Site Preparation Checklist
Cary 4000/5000/6000i UV-Vis spectrophotometer – Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
checklist, checklistsite, sitespecial, specialoperating, operatingtechnologies, technologiescustomer, customernotes, notesnitrogen, nitrogeninstrument, instrumentagilent, agilentpower, powerpreparation, preparationdescription, descriptionconsumption, consumptionrecommended
Cary Eclipse Fluorescence spectrophotometer – Site Preparation Checklist
Cary Eclipse Fluorescence spectrophotometer – Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
cary, caryeclipse, eclipsespectrophotometer, spectrophotometerchecklist, checklistsite, sitefluorescence, fluorescencespecial, specialoperating, operatingtechnologies, technologiescustomer, customernotes, notescomply, complyinstrument, instrumentagilent, agilentimposed
Agilent Cary 4000 5000 6000i UV-Vis-NIR - Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent Cary 4000 5000 6000i UV-Vis-NIR Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the…
Key words
special, specialservice, servicecustomer, customersite, siteoperating, operatingrequirements, requirementsnitrogen, nitrogeninstrument, instrumentnotes, notesengineer, engineerpreparation, preparationassembly, assemblyyour, yourmay, mayweight
Agilent Cary Sipper Accessory Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent Cary Sipper Accessory Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full value…
Key words
sipper, sippercary, caryaccessory, accessorysite, sitechecklist, checklistagilent, agilentpower, powerdescription, descriptionpreparation, preparationspecial, specialoperating, operatingweight, weightservice, servicerequirements, requirementscustomer
Other projects
GCMS
ICPMS
Follow us
FacebookX (Twitter)LinkedInYouTube
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike