Cary Eclipse Fluorescence spectrophotometer – Site Preparation Checklist
Manuals | 2012 | Agilent TechnologiesInstrumentation
Proper preparation of laboratory space and utilities is critical to ensure optimum performance and longevity of the Cary Eclipse Fluorescence Spectrophotometer.
This document outlines the essential site and environmental requirements required prior to installation of the Cary Eclipse system, serving both as a preparatory guide and an installation checklist.
Installation involves verifying bench dimensions, environmental conditions, power supply specifications and necessary consumables.
Key steps include:
Space Requirements: The packed system occupies 820×760×560 mm and weighs 54 kg; ensure a 90 cm high, vibration-free bench with adequate clearance.
Environmental Conditions: Maintain 20–25 °C (±2 °C), 8–80 % RH, dust-free atmosphere and optional nitrogen purge for low-temperature accessories.
Power Requirements: Single-phase AC 85–264 VAC, 47–63 Hz, 180 VA max consumption; use dedicated grounded outlet without extension cords.
Consumables: Standard microcell holder and optional quartz cuvettes or solid sample holders as specified.
Safety and Compliance: Adhere to local safety practices for handling hazardous materials and comply with EMC and LVD directives.
A well-prepared laboratory ensures accurate fluorescence measurements, minimizes downtime, and extends instrument life, benefiting QA/QC, research and industrial laboratories.
Advancements may include increased automation in sample handling, integration with LIMS, remote diagnostics and greener laboratory practices through improved energy and gas consumption management.
Thorough site preparation guided by this checklist is vital to optimize the performance, safety and service life of the Cary Eclipse system.
Fluorescence spectroscopy
IndustriesManufacturerAgilent Technologies
Summary
Significance of the Topic
Proper preparation of laboratory space and utilities is critical to ensure optimum performance and longevity of the Cary Eclipse Fluorescence Spectrophotometer.
Objectives and Overview
This document outlines the essential site and environmental requirements required prior to installation of the Cary Eclipse system, serving both as a preparatory guide and an installation checklist.
Methodology and Instrumentation
Installation involves verifying bench dimensions, environmental conditions, power supply specifications and necessary consumables.
Key steps include:
- Assess bench space and load capacity
- Confirm stable ambient temperature and humidity
- Ensure correct electrical grounding and outlet availability
- Prepare exhaust and gas supply if required
Key Findings and Discussion
Space Requirements: The packed system occupies 820×760×560 mm and weighs 54 kg; ensure a 90 cm high, vibration-free bench with adequate clearance.
Environmental Conditions: Maintain 20–25 °C (±2 °C), 8–80 % RH, dust-free atmosphere and optional nitrogen purge for low-temperature accessories.
Power Requirements: Single-phase AC 85–264 VAC, 47–63 Hz, 180 VA max consumption; use dedicated grounded outlet without extension cords.
Consumables: Standard microcell holder and optional quartz cuvettes or solid sample holders as specified.
Safety and Compliance: Adhere to local safety practices for handling hazardous materials and comply with EMC and LVD directives.
Benefits and Practical Applications
A well-prepared laboratory ensures accurate fluorescence measurements, minimizes downtime, and extends instrument life, benefiting QA/QC, research and industrial laboratories.
Used Instrumentation
- Cary Eclipse Fluorescence Spectrophotometer (Agilent Technologies)
- Standard Microcell Holder
- Optional Solid Sample Holder and Quartz Cuvettes
Future Trends and Potential Applications
Advancements may include increased automation in sample handling, integration with LIMS, remote diagnostics and greener laboratory practices through improved energy and gas consumption management.
Conclusion
Thorough site preparation guided by this checklist is vital to optimize the performance, safety and service life of the Cary Eclipse system.
References
- Agilent Technologies. Cary Eclipse Site Preparation Checklist, Part No. G9800-90000, Revision 1.0, March 2012.
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Cary 4000/5000/6000i UV-Vis spectrophotometer – Site Preparation Checklist
2016|Agilent Technologies|Manuals
Cary 4000/5000/6000i UV-Vis spectrophotometer – Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
checklist, checklistsite, sitespecial, specialoperating, operatingtechnologies, technologiescustomer, customernotes, notesnitrogen, nitrogeninstrument, instrumentagilent, agilentpower, powerpreparation, preparationdescription, descriptionconsumption, consumptionrecommended
Cary 7000 Universal Measurement System (UMS) – Site Preparation Checklist
2016|Agilent Technologies|Manuals
Cary 7000 Universal Measurement System (UMS) – Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site…
Key words
checklist, checklistsite, sitespecial, specialaccessory, accessoryoperating, operatinguniversal, universaltechnologies, technologiescustomer, customernotes, notesunpacked, unpackednitrogen, nitrogeninstrument, instrumentagilent, agilentpower, powerpreparation
Agilent Cary 4000 5000 6000i UV-Vis-NIR - Site Preparation Checklist
2023|Agilent Technologies|Manuals
Agilent CrossLab Start Up Services Agilent Cary 4000 5000 6000i UV-Vis-NIR Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the…
Key words
special, specialservice, servicecustomer, customersite, siteoperating, operatingrequirements, requirementsnitrogen, nitrogeninstrument, instrumentnotes, notesengineer, engineerpreparation, preparationassembly, assemblyyour, yourmay, mayweight
1 Agilent 8454 UV-Vis Spectrophotometer – Site Preparation Checklist
2014|Agilent Technologies|Manuals
Agilent 8454 UV-Vis Spectrophotometer – Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
checklist, checklistsite, sitespecial, specialtechnologies, technologiescustomer, customeroperating, operatingnotes, notescondensing, condensinginstrument, instrumentsupplies, suppliesagilent, agilentpower, powerpreparation, preparationdescription, descriptionconsumption