Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
Manuals | 2015 | Agilent TechnologiesInstrumentation
Proper site preparation is essential to ensure reliable, high-performance operation of Agilent 6500 Series Q-TOF LC/MS systems. Meeting space, environmental, utility and safety requirements before installation minimizes downtime, extends instrument lifetime and supports consistent analytical results.
This checklist defines the customer’s responsibilities and key specifications needed for a successful installation of 6500 Series Q-TOF LC/MS systems and associated HPLC modules. It covers bench space and layout, environmental conditions, power, venting, gas and solvent supplies, recommended configurations and remote diagnostics.
Site-preparation methodology includes:
Key requirements extracted from the checklist include:
By following this checklist, laboratories can:
As laboratory instruments evolve, site preparation may incorporate:
Thorough site preparation according to Agilent’s specifications is a critical first step for the reliable installation and operation of 6500 Series Q-TOF LC/MS systems. Adhering to bench, environmental, utility and safety requirements streamlines setup, maximizes uptime and safeguards analytical integrity.
Site Preparation Checklist for 6500 Series Q-TOF LC/MS Systems, Agilent Technologies, Document G2581-90034, Revision 11.0, January 2015.
Ion Mobility, LC/TOF, LC/HRMS, LC/MS, LC/MS/MS
IndustriesManufacturerAgilent Technologies
Summary
Significance of the topic
Proper site preparation is essential to ensure reliable, high-performance operation of Agilent 6500 Series Q-TOF LC/MS systems. Meeting space, environmental, utility and safety requirements before installation minimizes downtime, extends instrument lifetime and supports consistent analytical results.
Objectives and Study Overview
This checklist defines the customer’s responsibilities and key specifications needed for a successful installation of 6500 Series Q-TOF LC/MS systems and associated HPLC modules. It covers bench space and layout, environmental conditions, power, venting, gas and solvent supplies, recommended configurations and remote diagnostics.
Methodology and Instrumentation
Site-preparation methodology includes:
- Determination of bench footprint, clearances and load capacity based on instrument dimensions and weight.
- Verification of ambient temperature (15–35 °C) and humidity (20–85 % non-condensing) stability, and vibration-free support surfaces.
- Specification of exhaust-venting paths and flow rates for foreline pumps and ion sources.
- Identification of power outlets: dedicated 200–240 V AC, 15 A circuits for instrument mainframes, pumps, HPLC modules and data systems.
- Provision of high-purity gases (nitrogen, collision gas, drift gas, air) at specified pressures and flow rates.
- Recommended stacking configurations for HPLC modules to avoid vibration transfer.
- Setup of remote network and telephone access for diagnostics and support.
Main results and discussion
Key requirements extracted from the checklist include:
- Bench clearance: 8 cm side, 15 cm rear; maximum combined height limits to comply with ceiling and safety codes.
- Environmental stability: temperature variations under 3 °C from calibration; vibration-free bench; heat load up to 15 524 BTU/hr.
- Exhaust: separate ½″ tubing for foreline and source exhaust; typical flows 3–10 L/min for pumps, 40 L/min for ion source.
- Power: two 200–240 V AC outlets per Q-TOF mainframe; additional outlets for HPLC and data systems.
- Gas supplies: nitrogen (95 %–99.999 %) for drying (up to 60 L/min) and collision cell (1–2 mL/min), argon optional collision gas (1–2 mL/min), drift gas for ion mobility, hydrocarbon-free air for chip cube mode.
- HPLC stack: avoid stacking HPLC directly atop the Q-TOF; maintain ventilation space around thermostatted modules.
Benefits and practical applications
By following this checklist, laboratories can:
- Prevent installation delays due to improper site conditions.
- Ensure instrument safety and compliance with local codes.
- Optimize system performance and analytical reproducibility.
- Reduce maintenance issues and extend instrument service life.
Future trends and possibilities
As laboratory instruments evolve, site preparation may incorporate:
- IoT-enabled environmental monitoring for real-time feedback.
- Predictive maintenance through integrated remote-diagnostics platforms.
- Modular lab benches designed for quick reconfiguration of analytical systems.
- Enhanced gas-generator technologies to reduce dependency on high-pressure bottles.
Conclusion
Thorough site preparation according to Agilent’s specifications is a critical first step for the reliable installation and operation of 6500 Series Q-TOF LC/MS systems. Adhering to bench, environmental, utility and safety requirements streamlines setup, maximizes uptime and safeguards analytical integrity.
Used Instrumentation
- Agilent 6500 Series Q-TOF LC/MS models (G6520B, G6530A/B, G6538A, G6540A/B, G6545A, G6550A iFunnel, G6560A Ion Mobility).
- Agilent 1200/1260/1290 HPLC modules and Chip Cube.
- Dry pumps (Agilent TS800, MS40+) and rough pumps (Edwards XDS35i).
- Ion sources (ESI, APCI, Multimode, APPI, Jet Stream).
- Q-TOF and IM-Q-TOF benches and data acquisition systems.
Reference
Site Preparation Checklist for 6500 Series Q-TOF LC/MS Systems, Agilent Technologies, Document G2581-90034, Revision 11.0, January 2015.
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
2017|Agilent Technologies|Manuals
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, sitetechnologies, technologiesrough, roughley, leyagilent, agilentpreparation, preparationrobert, robertsource, sourceengineering, engineeringspecial, specialcondensing, condensingpumps, pumpspump, pumpsupport
Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
2018|Agilent Technologies|Manuals
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct…
Key words
checklist, checklistsite, siterough, roughtechnologies, technologiesagilent, agilentpreparation, preparationsource, sourcespecial, specialcondensing, condensingpumps, pumpspump, pumpnotes, notesrequirements, requirementsvariations, variationsforeline
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
2019|Agilent Technologies|Manuals
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, siterough, roughtechnologies, technologiesagilent, agilentpreparation, preparationpump, pumpsource, sourcespecial, specialcondensing, condensingpumps, pumpsnotes, notesrequirements, requirementsvariations, variationsforeline
Agilent 6500 Series LC/QTOF Site Preparation Checklist
2023|Agilent Technologies|Manuals
Agilent 6500 Series Site Preparation Checklist Agilent CrossLab Start Up Services Agilent 6500 Series LC/QTOF Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes…
Key words
rough, roughservice, servicerequirements, requirementspump, pumpspecial, specialsite, sitecondensing, condensingsource, sourceinstrument, instrumentcustomer, customernotes, notesnitrogen, nitrogenvariations, variationspumps, pumpsforeline