Agilent - 6200 Series LCMS TOF – Site Preparation Checklist
Manuals | 2011 | Agilent TechnologiesInstrumentation
Proper preparation of the laboratory site is essential to ensure reliable operation, optimal performance, and extended lifetime of Agilent 6200 Series LCMS TOF instruments.
This site preparation checklist establishes the requirements for space, utilities, environmental conditions, and supplies needed to install and operate Agilent LCMS TOF models G1969A, G6210A, G6220A, G6224A, and G6230A. It clarifies customer responsibilities and helps avoid installation delays.
The document applies a systematic approach to laboratory planning, covering:
Adhering to this checklist accelerates installation, reduces downtime, and ensures consistent analytical results by maintaining optimal instrument environment and utilities.
With growing adoption of automated laboratories, future site preparation may integrate IoT sensors for continuous environmental monitoring, enabling predictive maintenance and further minimizing unscheduled interruptions.
Systematic site preparation according to the 6200 Series LCMS TOF checklist establishes a solid foundation for high-performance, reliable operation, and long-term data quality.
No external references were listed in the original checklist.
LC/TOF, LC/HRMS, LC/MS
IndustriesManufacturerAgilent Technologies
Summary
Significance of the topic
Proper preparation of the laboratory site is essential to ensure reliable operation, optimal performance, and extended lifetime of Agilent 6200 Series LCMS TOF instruments.
Objectives and Overview of the Document
This site preparation checklist establishes the requirements for space, utilities, environmental conditions, and supplies needed to install and operate Agilent LCMS TOF models G1969A, G6210A, G6220A, G6224A, and G6230A. It clarifies customer responsibilities and helps avoid installation delays.
Methodology and Instrumentation
The document applies a systematic approach to laboratory planning, covering:
- Bench space dimensions and load-bearing capacity
- Environmental controls for temperature, humidity, and exhaust
- Electrical supply specifications and power consumption
- Required gases, solvents, reagents, and consumables
Main Requirements and Key Considerations
- Bench Dimensions and Load Capacity
- Allow at least 30 cm clearance for source installation and removal.
- Support surface must be vibration-free and handle up to 136 kg.
- Total instrument weights range from 114.5 kg to 132 kg depending on model.
- Environmental Conditions
- Maintain ambient temperature between 15 °C and 35 °C with ≤3 °C variation.
- Keep humidity under 90% non-condensing.
- Provide separate exhaust lines for rough pump and ion source (½″ hose barbs).
- Power Supply
- Single 15 A outlet at 200–240 VAC ±10%, 50/60 Hz.
- Maximum power draw up to 2300 VA (approximately 1100–1190 W).
- Operating Supplies
- Nitrogen gas (≥99.5% purity, hydrocarbon-free, 85–100 psi).
- HPLC-grade solvents: water, methanol, isopropanol, acetonitrile.
- Buffers and acids: ammonium formate (≥97%), acetic or formic acid (≥97%).
- Remote Diagnostics
- LAN connection recommended for control PC to enable remote support.
- Optional second phone line for direct communication with service teams.
Benefits and Practical Applications of the Method
Adhering to this checklist accelerates installation, reduces downtime, and ensures consistent analytical results by maintaining optimal instrument environment and utilities.
Future Trends and Possibilities for Use
With growing adoption of automated laboratories, future site preparation may integrate IoT sensors for continuous environmental monitoring, enabling predictive maintenance and further minimizing unscheduled interruptions.
Conclusion
Systematic site preparation according to the 6200 Series LCMS TOF checklist establishes a solid foundation for high-performance, reliable operation, and long-term data quality.
Reference
No external references were listed in the original checklist.
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
2017|Agilent Technologies|Manuals
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, sitetechnologies, technologiesrough, roughley, leyagilent, agilentpreparation, preparationrobert, robertsource, sourceengineering, engineeringspecial, specialcondensing, condensingpumps, pumpspump, pumpsupport
Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
2018|Agilent Technologies|Manuals
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct…
Key words
checklist, checklistsite, siterough, roughtechnologies, technologiesagilent, agilentpreparation, preparationsource, sourcespecial, specialcondensing, condensingpumps, pumpspump, pumpnotes, notesrequirements, requirementsvariations, variationsforeline
Agilent 6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
2015|Agilent Technologies|Manuals
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, sitetechnologies, technologiesrough, roughagilent, agilentcondensing, condensingpreparation, preparationsource, sourcespecial, specialforeline, forelinepumps, pumpspump, pumpnotes, notesexhaust, exhaustrequirements
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist
2019|Agilent Technologies|Manuals
6500 Series Q-TOF LC/MS Systems – Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, siterough, roughtechnologies, technologiesagilent, agilentpreparation, preparationpump, pumpsource, sourcespecial, specialcondensing, condensingpumps, pumpsnotes, notesrequirements, requirementsvariations, variationsforeline